Hawking Structures Inc was contracted to complete this 50’ wide x 40’ long Calhoun Super Structure “CL” series building designed specifically for sea-can installations. The customer wanted to give his employees some covered work areas for the busy on and off seasons of marine storage. This structure was was built for Terence Marine Inc. for a work shop. Click here to watch the timelapse video for this build.
In 2024, Hawking Structures was contacted by our customer to return to the existing building installed in 2022 to add steel clad end walls and interior for use as a heated shop. Insulation was added along with vapour barrier to make this building as warm as possible. The guys did an excellent job closing this in and the customer is happy with their new heated workspace.
What Was Done
project details
project date
Original Build
October 2022 | 1 Week
Close-In & Heat Addition
October 2024 | 1 Week
project type
50′ x 40′ “CL” Calhoun Super Structure
Need Help?