32′ x 100′ “CC” Calhoun Super Structure
Hawking Structures Inc. was contracted in April–May 2025 to reconstruct and restore this 32’ x 100’ CC series Calhoun SuperStructure used for hay storage in Phelpston.
The project involved replacing approximately 50 feet of a collapsed section of the existing structure and installing a new continuous 32’ x 100’ fabric cover. Built on 8” x 8” wood posts, the restored building provides renewed strength, weather protection, and long-term functionality for agricultural hay storage. Completed in two weeks, this reconstruction delivered a cost-effective solution that extended the life and usability of the structure.
What Was Done
project details
project date
April-May 2025 | 2 Weeks
project type
32′ x 100′ Hay Storage Calhoun Super Structure Restoration and Recover.